[1]
Maldaner, K.L.S., Lima, A.M.T. de, Akama, A. and Marques, E.E. 2019. INTEGRATIVE ENVIRONMENTAL ASSESSMENT AND THE SOCIOECONOMICS SCENARIOS OF MUNICIPALITIES IMPACTED BY THE HYDROELETRIC POWER PLANTS PEIXE ANGICAL AND SAO SALVADOR IN TOCANTINS RIVER, BRAZIL. Revista Brasileira de Ciências Ambientais (RBCIAMB). 52 (Nov. 2019), 119–134. DOI:https://doi.org/10.5327/Z2176-947820190094.